A comprehensive industrial warehouse transformation featuring state-of-the-art loading dock systems, 3-phase electrical upgrades, high-bay LED lighting, climate-controlled storage zones, and full OSHA compliance — delivered on time in 14 weeks.

25,000
Square Feet
14
Weeks Duration
2024
Year Completed
5.0
Stars Rating
Project Overview

Full-Scale Industrial
Warehouse Transformation

Tell Projects TX was engaged to execute a full-scale renovation of a 25,000 sqft distribution warehouse in Katy, TX serving a regional logistics operator. The facility had reached the end of its functional life cycle — aging dock equipment, undersized electrical infrastructure, and inadequate lighting were impacting throughput and worker safety.

Our team delivered a phased renovation plan that allowed the facility to maintain reduced operations throughout the project. Structural reinforcements supported an expanded mezzanine for 3,000 sqft of modernized office space, while ground-floor operations received automated dock levelers, 3-phase power upgrades, and a complete high-bay LED lighting system.

Climate-controlled storage zones were carved out using VRF HVAC technology, enabling the client to store temperature-sensitive inventory without offsite rental costs. Fire suppression was upgraded to a wet-pipe NFPA 13 system covering all bays and the new mezzanine office.

The project was delivered on schedule in 14 weeks with zero recordable safety incidents, achieving 100% OSHA compliance and a 45% reduction in energy costs against baseline.

Quick Project Facts

Building Type Distribution Warehouse
Total Square Footage 25,000 sqft
Office Space 3,000 sqft
Clear Height 28 ft
Dock Doors 8 Dock Doors
Loading Bays 4 Drive-In Bays
Project Duration 14 Weeks
Completion Year 2024
Location Katy, TX
Safety Record Zero Incidents
Project Gallery

Renovation Highlights

From loading dock upgrades to high-bay LED installation — a visual record of the transformation.

Scope of Work

What We Delivered

Every system in this Katy, TX warehouse was assessed, upgraded, and brought to modern operational standards.

Loading Dock Upgrades

Installed 8 automated dock levelers with hydraulic lip plates, weatherseals, and safety lights. Added dock bumpers, wheel restraints, and leveler control panels meeting OSHA 1910.178 standards.

3-Phase Electrical

Upgraded service entrance to 1,200A 3-phase, installed new switchgear, ran dedicated circuits for fork lifts and heavy machinery, and added EV charger infrastructure for fleet electrification.

High-Bay LED Lighting

Replaced 400W metal halide fixtures with 240W UFO LED high-bays achieving 50fc average floor illuminance. Added motion-sensing controls and emergency backup lighting throughout all zones.

Office Modernization

Constructed 3,000 sqft mezzanine office space with open-plan workstations, private conference rooms, break area, ADA-compliant restrooms, and data/telecommunications infrastructure.

Climate Control Zones

Created four climate-controlled storage zones using VRF HVAC technology. Zones maintain 55–75°F independently, enabling temperature-sensitive inventory storage and reducing spoilage.

Floor Reinforcement

Repaired and reinforced existing slab, applied 3-coat industrial epoxy flooring system rated for 8,000 lbs/sqft. Painted aisle markings, forklift lanes, and safety zones per OSHA standards.

Fire Suppression

Installed NFPA 13 wet-pipe sprinkler system throughout the warehouse floor and mezzanine. Upgraded fire alarm panel, added smoke/heat detectors, and completed fire marshal inspection sign-off.

Security Systems

Installed IP camera network with 64-channel NVR, access control on all dock doors and personnel entry points, perimeter lighting, and remote monitoring integration for 24/7 visibility.

Project Challenges

Complex Problems,
Expert Solutions

Every large-scale industrial renovation presents unique engineering and logistical challenges. Our team anticipated each obstacle and deployed proven solutions to keep the project on track.

Operating During Renovations

The client required 40% operational capacity throughout construction. We implemented strict work zone partitioning with temporary barriers, maintained clear forklift lanes at all times, and scheduled concrete and electrical work during weekend shutdowns.

Heavy Equipment Logistics

Delivering and staging industrial electrical switchgear, dock leveler components, and HVAC rooftop units required precise crane scheduling and temporary road closures coordinated with Katy city traffic control to avoid disrupting adjacent tenants.

3-Phase Electrical Complexity

Upgrading from single-phase to 3-phase power while maintaining live production circuits required meticulous load calculations, temporary generator supply, and close coordination with CenterPoint Energy for the new service entrance installation.

Climate Zone Transitions

Engineering four distinct climate zones within one open warehouse required thermal break wall systems, vapor barriers, and precise airflow modeling to prevent condensation, cross-contamination, and thermal bridging between adjacent zones.

Materials Used

Industrial-Grade Materials

Only commercial-rated, long-life materials were specified for this Katy, TX warehouse project to ensure decades of reliable performance under heavy industrial use.

Epoxy-Coated Concrete

Three-coat industrial epoxy system over repaired and shot-blasted concrete slab. Rated 8,000 lbs/sqft with anti-slip aggregate finish and chemical resistance.

High-Bay LED Fixtures

240W UFO LED high-bay fixtures rated 130 lm/W, IP65 for dusty environments. 5000K color temperature with 50,000-hour rated lifespan and 5-year warranty.

Insulated Dock Doors

R-17 insulated steel sectional dock doors with galvanized hardware, heavy-duty springs, and full weatherstrip seals for energy efficiency and climate separation.

VRF HVAC Systems

Variable Refrigerant Flow multi-zone systems allowing each climate zone to operate independently. 18 SEER2 rated for maximum energy efficiency in hot Katy, TX summers.

Fire-Rated Steel

2-hour fire-rated steel framing and metal deck for mezzanine construction. Intumescent coating on all structural steel members per IBC 2021 requirements.

Industrial Electrical Panels

Square D 1,200A 3-phase main switchgear with branch panels rated NEMA 3R for the harsh industrial environment. Arc flash labeled per NFPA 70E standards.

Project Timeline

14 Weeks From
Start to Completion

Our phased construction methodology ensured minimal disruption to the client's operations while maintaining strict quality controls and safety standards throughout the 14-week renovation of this Katy, TX distribution warehouse.

Talk to a Project Manager
1

Assessment & Engineering

Weeks 1–3

Structural assessment, load calculations, electrical design drawings, HVAC engineering, fire suppression plans, and permitting with the City of Katy Building Department. Procurement orders placed for long-lead items including switchgear and dock levelers.

2

Structural & Electrical

Weeks 4–7

Mezzanine steel erection and concrete deck pour, electrical service entrance upgrade with CenterPoint coordination, 3-phase switchgear installation, and underground conduit runs. Dock pit modifications and floor slab repairs completed.

3

Interior & Systems

Weeks 8–11

High-bay LED fixture installation, climate zone wall framing and VRF HVAC rough-in, fire suppression piping, office interior build-out, epoxy flooring application, security system rough-in, and dock door installation with automated levelers.

4

Testing & Commissioning

Weeks 12–14

System commissioning and testing, fire suppression flow tests, electrical load testing and arc flash study, HVAC balancing across all climate zones, fire marshal inspection, final walkthrough, punch list completion, and Certificate of Occupancy issuance.

Client Testimonial

What Our Client Said

"Tell Projects TX transformed our aging warehouse into a world-class distribution facility. The phased approach meant we never fully shut down, and they delivered every milestone on schedule across all 14 weeks. The new loading dock system alone cut our truck turnaround time by 60%. Our energy bills dropped 45% thanks to the LED lighting and VRF HVAC zones. Most importantly, our team feels genuinely safe in the facility now. If you have a warehouse project in Katy, there is no one else to call."
RC
Robert C., Operations Director
Katy Distribution Center Inc.
Katy, TX — Completed 2024
Measurable Results

Proven Performance Gains

Quantified improvements measured 90 days post-completion compared to pre-renovation baseline.

45%
Energy Savings

Reduction in monthly utility costs from LED lighting upgrade and VRF HVAC system efficiency.

60%
Faster Loading

Improvement in truck turnaround time from automated dock levelers and optimized dock workflow.

30%
More Storage

Increase in usable storage capacity from climate zone optimization and improved racking layout.

100%
OSHA Compliance

Full compliance achieved on first inspection — zero deficiencies cited by the OSHA inspector.

Our Process

How We Approach Warehouse Projects

A structured four-phase process refined over 15 years of industrial construction in the Katy, TX area.

1

Facility Assessment

We conduct a comprehensive site survey covering structural integrity, electrical capacity, fire code compliance, and operational workflow to identify every improvement opportunity.

2

Engineering Design

Licensed engineers produce stamped drawings for all systems. We handle all permitting with the City of Katy and Harris County, and coordinate utility upgrades with providers.

3

Phased Construction

Our phased approach allows your operations to continue at reduced capacity. Dedicated site supervisors provide daily progress updates and manage all subcontractor coordination.

4

Operational Testing

Before handover, every system undergoes full commissioning and operational testing. We resolve all punch list items before Certificate of Occupancy and final sign-off.

FAQ

Warehouse Renovation Questions

Common questions from Katy, TX business owners planning industrial warehouse upgrades.

A typical 25,000 sqft industrial warehouse renovation in Katy, TX takes approximately 12 to 16 weeks depending on scope. This includes structural work, electrical upgrades, HVAC systems, flooring, and fire suppression installation. Our phased construction approach minimizes downtime for your business operations while ensuring code compliance at every stage.
Yes. Tell Projects TX specializes in phased renovation approaches that allow warehouses in Katy, TX to continue operations during construction. We partition work zones, maintain clear egress paths, and schedule heavy work during off-peak hours to minimize disruption to your logistics or distribution operations. Our Katy Distribution Center project maintained 40% capacity throughout all 14 weeks.
Our warehouse electrical upgrades in Katy, TX typically include 3-phase power panel upgrades, high-bay LED lighting systems replacing outdated fluorescent or metal halide fixtures, dedicated circuits for heavy machinery, emergency lighting with battery backup, EV charging infrastructure for fleet electrification, and full code compliance with Texas state and NEC electrical standards. All work is performed by licensed master electricians.
Warehouse renovation costs in Katy, TX vary based on scope, square footage, and systems involved. A comprehensive renovation including electrical, HVAC, loading dock upgrades, flooring, and fire suppression for a 25,000 sqft facility typically ranges from $15 to $45 per square foot. Factors that affect cost include the degree of structural work, number of climate zones, electrical service capacity needed, and whether the building requires a new fire suppression system versus upgrade. Contact Tell Projects TX at (832) 639-6473 for a free detailed estimate on your project.
Absolutely. Every warehouse renovation we complete in Katy, TX is designed and built to meet full OSHA compliance standards. This includes proper aisle markings and widths per 1910.22, fire suppression systems meeting NFPA 13, emergency exit signage and lighting, fall protection on elevated surfaces, adequate lighting levels per OSHA 1910.303, and dock safety equipment including wheel restraints and dock levelers. We coordinate with inspectors throughout the project and achieved 100% OSHA compliance on first inspection for this project.
Ready to Upgrade?

Upgrade Your Warehouse
Facility in Katy, TX

Join the Katy, TX businesses that have transformed their industrial operations with Tell Projects TX. Licensed, insured, and experienced in large-scale warehouse and industrial renovations. Free consultation — no obligation.

Licensed
TX Contractor
Insured
Full Coverage
Bonded
Your Protection
5.0 Stars
500+ Reviews
More Projects

Related Projects in Katy, TX

Explore more of our commercial construction portfolio serving Katy, TX businesses.

Retail center renovation project in Katy TX by Tell Projects
Commercial Renovation

Retail Center Makeover

12,000 sqft retail renovation in Katy, TX with updated electrical, HVAC, and ADA-compliant features.

12,000 sqft 8 Weeks 2024
View Portfolio
Multifamily apartment complex renovation in Katy TX by Tell Projects
Multifamily Construction

Apartment Complex Upgrade

48-unit multifamily renovation in Katy, TX with modernized amenities and energy-efficient systems.

48 Units 12 Weeks 2024
View Portfolio
Office space build-out in Katy TX by Tell Projects
Interior Build-Out

Office Space Build-Out

Modern 8,500 sqft office interior build-out in Katy, TX with open-concept workspace and conference rooms.

8,500 sqft 10 Weeks 2024
View Portfolio
Restaurant renovation in Katy TX by Tell Projects
Restaurant Renovation

Restaurant Remodel

Complete restaurant renovation in Katy, TX with commercial kitchen upgrade and dining area redesign.

5,200 sqft 6 Weeks 2024
View Portfolio
Medical office build-out in Katy TX by Tell Projects
Medical Office

Medical Office Build-Out

Professional medical office build-out in Katy, TX with exam rooms and healthcare compliance.

6,800 sqft 9 Weeks 2024
View Portfolio

View Full Portfolio

See all our commercial construction, renovation, and industrial projects in Katy, TX.

All Projects